Vallejo, Calif.
DownloadBusiness Operations Director Jay Anast, for California Dry Dock Solutions walks through the underground water pumping station for the Mare Island dry docks prior to the arrival of the Solon Turman, California Dry Dock Solutions was recently awarded a $3.1 Million contract from the U.S.Navy to dismantle two ships currently located in Suisun Bay
- Filename
- Mare_Island_drydock_open2.JPG
- Copyright
- Kim Kulish
- Image Size
- 5616x3744 / 13.1MB
- Contained in galleries
- Mare_Island_Dry_Dock_Open

